All Categories

KJ215 Single Boom Hydraulic Underground Jumbo Drill Rig for Tunnel Excavation

  • Product Description
  • Specifications
  • Applications
  • Advantages
  • FAQ
  • Related Products

Product Description

The KJ215 Hydraulic Development Drill Rig is a compact underground drilling machine designed for narrow tunnels and mine development. Equipped with a powerful hydraulic rock drill, a 360° rotating feed beam, and a robust universal boom, it delivers fast, accurate, and efficient drilling in hard rock conditions. The four-wheel-drive articulated chassis ensures excellent maneuverability in confined spaces. Suitable for drilling vertical, horizontal, and inclined blast holes, as well as rock bolting applications, the KJ215 is widely used in underground mining and tunneling projects with cross-sections ranging from 5 m² to 25 m².

Quzhou Mazellion Heavy Industry Technology Co., Ltd. is a professional manufacturer of diesel screw air compressors and mining drilling equipment, serving global mining, quarry, water well drilling, and construction projects. We provide factory-direct supply, stable quality, and full OEM customization to help customers win local markets with better cost performance and reliability.

To start cooperation: send your inquiry → get a tailored technical solution & quotation → confirm order → production & testing → fast shipment → long-term spare parts & technical support. We respond quickly and support you throughout the whole project.

Specifications

Drilling Rig Specification Table

Dimensions and Weight

Parameter Specification
Length 10220 mm
Width 1400 mm
Height 2000 / 2850 mm
Weight Approx. 11000 kg
Tramming speed on flat ground 10 km/h
Maximum climbing capacity 25% (14°)

Safety Protection

Parameter Specification
Noise level < 100 dB(A)
Lifting safety roof FOPS & ROPS certified

Air & Water System

Parameter Specification
Air compressor DLGF 0.7/8-5.5(B)
Capacity of air compressor 0.7 m³/min
Pressure 6-8 bar
Device of shank lubrication Electronic pulse lubrication pump
Air consumption of lubrication 0.3 m³/min
Oil consumption of lubrication 180-250 g/h
Power of water pump 1.5 kW / 4 kW
Capacity of water pump 3 m³/h / 5.8 m³/h

Chassis

Parameter Specification
Diesel engine Cummins B3.9CS4-80C, 59 kW / 2500 rpm
Steering mechanism Articulated steering: ±40°
Drive system Closed hydraulic system for four-wheel driving
Swing of rear axle ±6°
Parking braking Wet multidisc brake
Travelling braking Hydrostatic braking
Fuel tank 30 L

Drilling System

Parameter Specification
Rock drill HC50 / HC95 / RD18U
Rod size R38 / T38
Impact power 13 kW / 20 kW / 18 kW
Impact frequency 62 Hz / 62 Hz / 57 Hz
Hole diameter Ø32-76 mm / Ø42-89 mm
Beam rotation 360°
Feed extension 1600 mm
Model of drill boom K21
Form of drill boom Self-leveling

Electric Hydraulic Power Unit

Parameter Specification
Motor 45 kW / 55 kW
Pump Type Axial variable displacement piston pump
Rotation Gear pump
Filter fineness 10 μ
Hydraulic oil tank 240 L
Hydraulic cooler Water cooler
Working voltage 380 V
Frequency 50 Hz
Starting method Star-triangle
Cable specifications 3×35+3G6 / 3×50+3G10

Applications

1. Underground Metal Mine Development

Ideal for tunnel development and production preparation in gold, copper, iron ore, zinc, lead, and other underground metal mines. The KJ215 efficiently drills blast holes for drift driving, crosscuts, and access tunnels.

2. Narrow Vein Mining Operations

Designed specifically for narrow underground workings and confined spaces. Its compact structure and articulated chassis allow flexible operation in tunnel sections ranging from 5–25 m² where larger drilling jumbos cannot easily access.

3. Hard Rock Tunnel Excavation

Suitable for railway tunnels, highway tunnels, hydropower tunnels, and underground civil engineering projects. The hydraulic drilling system delivers fast penetration rates and precise blast hole positioning in hard rock formations.

4. Underground Mine Infrastructure Construction

Widely used for the development of ventilation drifts, transportation tunnels, service galleries, pump chambers, and other underground mine infrastructure requiring accurate drilling and controlled blasting.

5. Cross-Cut and Lateral Drift Development

The flexible boom system can be used for cross-cut excavation, branch tunnel construction, and underground roadway expansion projects, improving drilling coverage and excavation efficiency.

6. Rock Bolting and Ground Support Applications

In addition to face drilling, the boom can perform rock bolt hole drilling and ground support operations, helping improve tunnel stability and underground safety during mining and tunneling projects.

Advantages

1. Designed for Narrow Underground Tunnels

Compact dimensions of only 1400 mm width allow the rig to operate efficiently in narrow underground drifts and mine roadways.

2. Excellent Drilling Coverage

The robust universal boom provides optimal face coverage for tunnel sections ranging from 5 m² to 25 m², reducing repositioning time and improving productivity.

3. Flexible and Precise Positioning

The feed beam can rotate 360° and automatically maintain level alignment, enabling fast and accurate hole positioning for vertical, inclined, and horizontal drilling.

4. Multi-Purpose Drilling Capability

In addition to blast-hole drilling, the boom can be used for cross-cut excavation and rock bolting operations, increasing equipment utilization.

5. High Mobility in Confined Areas

The balanced four-wheel-drive articulated chassis ensures excellent maneuverability, stability, and safety in narrow underground workings.

6. High Drilling Efficiency

Equipped with a high-frequency hydraulic rock drill featuring stepped-piston technology, the rig delivers faster penetration rates, lower drilling tool consumption, and higher equipment reliability.

FAQ

Q1:Can the machine be customized?

Yes. Drilling coverage, rock drill model, electrical system, engine configuration, and other specifications can be customized to meet specific project requirements.

Q2:Which payment term can you accept?

30% T/T in advanced, 70% T/T against the B/L copy.

Q3:What is the delivery time?

Standard production lead time is usually 30–60 days after receiving the deposit, depending on configuration and order quantity.

Q4:How are spare parts supplied?

Common spare parts are available from stock and can be shipped by express courier, air freight, or sea freight according to customer requirements.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000